Working Schedule

upto June 17 (Analysis and Design Period)

  • Exploring the code.
  • Make a short rough bio about each tool - the way they work.
  • Find the Image Processing functionalities used in them. Look at duplication in the functionalities.

(5-10 tools/day depending on varied length.

  • Preparation of rough ideas of each functionalities and the way they will be implemented with additional improvements in usability.
  • Discuss with mentor and other developers about the final plan for the design of the library. This includes :
    • the possible formats to be supported (In addition to the already started in include/icv.h)
    • Addition of Different functionalities and there usability improvements.
    • Discussion about common groups identified for different functionalities.
  • Learning usage from BRLCAD libraries like common.h libbu libbio

At the end of this period : A finalized plan to proceed for the development of the library.

June 17 - Sep 2 (Development Phase)

June 17 - July 1 [\~2 Week]

  • Implementation of various Structures of the new library
  • Deciding about the functions to be included in different files based on categories.
  • Deciding the input parameters and return type of each function.
  • Identify error handling in each Function.
  • Witting Documentation of all the structures included. PDF+Wiki
  • Creating Patches all together.

July 1 - Aug 12 [\~6 Week]

  • Implementation of image processing functionalities focusing on categories identified during project analysis period.
  • Enough Time is allotted to this to follow up the implementation as decided during analysis step.
  • Implementation of 3-4 functions a week which includes unit-level testing and code coverage.
  • Documentation of the functions including input output arguments/methods etc.

To implement the image processing functionalities common groups have been identified details of which are given at ImplemnetationDetails-1 .Further these groups have varied implementation load, Thus to balance the load for a particular following weekly plan has been chalked in.

Sub Division

  • WEEK-1
    • Crop or Rect (GROUP#1)
    • Differences and other arithmetic operations (GROUP#2)
  • WEEK-2
    • Filters, (GROUP#3)
  • WEEK-3
    • Histograms and Equalizations (GROUP#4)
    • Stats (GROUP#6)
  • WEEK-4
    • Scale or Shrink (GROUP#5)
    • Interpolate/Decimate (GROUP#8)
  • WEEK-5
    • Thresh (GROUP#7)
    • Background and Border (GROUP#9)
  • WEEK-6
    • Reserved Week

Aug 12 - Sept 2 [\~3 Week]

=

  • Implimentation of Import/Export Modules.
  • Testing these Modules.
  • Documentation of these modules

Sep 2 - Sep 27 (Final Wrap UP and Cleaning)

Sep 2 - Sep 9 [\~1 Week]

  • Code Cleaning
  • System Level testing for the library.
  • Giving final structure to the documentation.

Sep9 - Sep16 [\~1 Week]

  • Creating Demos For each functionality and Final cleaning

Sep 16 - Sep 27 [\~1 Week]

  • Performance Analysis using gprof for different data.
  • Final code submission with Google.